Arabi, S, Eshtehardian, E and Shafiei, I (2022) Using Bayesian Networks for Selecting Risk-Response Strategies in Construction Projects. Journal of Construction Engineering and Management, 148(08).

Chang, T, Chi, S and Im, S (2022) Understanding User Experience and Satisfaction with Urban Infrastructure through Text Mining of Civil Complaint Data. Journal of Construction Engineering and Management, 148(08).

Dias Barkokebas, R, Al-Hussein, M and Li, X (2022) VR–MOCAP-Enabled Ergonomic Risk Assessment of Workstation Prototypes in Offsite Construction. Journal of Construction Engineering and Management, 148(08).

Ezzeddine, A, Shehab, L, Lucko, G and Hamzeh, F (2022) Forecasting Construction Project Performance with Momentum Using Singularity Functions in LPS. Journal of Construction Engineering and Management, 148(08).

Feng, K, Wang, S, Lu, W, Liu, C and Wang, Y (2022) Planning Construction Projects in Deep Uncertainty: A Data-Driven Uncertainty Analysis Approach. Journal of Construction Engineering and Management, 148(08).

Gomes Araújo, L and Lucko, G (2022) Best Practices for Case Studies in Construction Engineering and Management Research. Journal of Construction Engineering and Management, 148(08).

Heaton, R, Martin, H, Chadee, A, Milling, A, Dunne, S and Borthwick, F (2022) The Construction Materials Conundrum: Practical Solutions to Address Integrated Supply Chain Complexities. Journal of Construction Engineering and Management, 148(08).

Islam, M S, Mohandes, S R, Mahdiyar, A, Fallahpour, A and Olanipekun, A O (2022) A Coupled Genetic Programming Monte Carlo Simulation–Based Model for Cost Overrun Prediction of Thermal Power Plant Projects. Journal of Construction Engineering and Management, 148(08).

Koo, H J and O’Connor, J T (2022) A Strategy for Building Design Quality Improvement through BIM Capability Analysis. Journal of Construction Engineering and Management, 148(08).

Le, C, Jeong, H D, Damnjanovic, I and Bukkapatnam, S (2022) Pareto Principle in Scoping-Phase Cost Estimating: A Multiobjective Optimization Approach for Selecting and Applying Optimal Major Work Items. Journal of Construction Engineering and Management, 148(08).

Lee, C, Chong, H, Tanko, B L and Klufallah, M (2022) Effect between Trust in Communication Technology and Interorganizational Trust in BIM-Enabled Projects. Journal of Construction Engineering and Management, 148(08).

Lee, G H, Kim, J I, Koo, C and Kim, T W (2022) Automated Generation of Precast Concrete Slab Stacks for Transportation in Offsite Construction Projects. Journal of Construction Engineering and Management, 148(08).

  • Type: Journal Article
  • Keywords: Precast concrete (PC); Off-site construction (OSC); Stacking problem; Transportation; PC slab;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002333
  • Abstract:
    In an off-site construction (OSC) project, how to transport the components has a significant impact on the project performance. During the transportation, slab stacks are usually generated in the process of loading precast concrete (PC) slabs on a trailer. Because there are various factors for consideration and numerous ways of composing the stacks, it is difficult for production managers to generate the stack quickly and effectively without the help of a computer. This study sought to formalize the process of generating PC slab stacks, which consists of the following six phases: (1) input data and parameters, (2) make a preliminary stack by tolerance, (3) refine the stack with stackability and installation sequence, (4) divide stacks by maximum layer, (5) check loadability of stacks, and (6) calculate and report metrics. As a result, a prototype developed based on the formalized process offered more stable and errorless stacking results that limit the reshuffling effort of site installers than experts (prototype: 93.0% stability, zero errors, and zero reshuffling work; experts: 88.6% stability, 1.5 errors, and 1.1 reshuffling work). This study contributes to the transportation theory of OSC by identifying considerations for PC slab stacking and formalizing the specialized stacking process reflecting them, which enables the development of an automated PC slab generation tool in OSC projects.

Liu, Y, Yao, F, Ji, Y, Tong, W, Liu, G, Li, H X and Hu, X (2022) Quality Control for Offsite Construction: Review and Future Directions. Journal of Construction Engineering and Management, 148(08).

Mmereki, D and Brouwer, D (2022) Application of Innovative Materials and Methods in Green Buildings and Associated Occupational Exposure and Health of Construction Workers: A Systematic Literature Review. Journal of Construction Engineering and Management, 148(08).

Simmons, D R, Polmear, M, Bae, H and McCall, C (2022) Applying a New Lens: Using Photo Elicitation in Construction Engineering Management Research. Journal of Construction Engineering and Management, 148(08).

Son, J, O’Brien, W J and Thomas, S R (2022) Recommended Practices for Effective Management of Academia–Industry Collaborative Research Teams in Construction Management. Journal of Construction Engineering and Management, 148(08).

Wang, Y, Thangasamy, V K, Tiong, R L K and Zhang, L (2022) Improved Workflow for Precast Element Design Based on BIM and Lean Construction. Journal of Construction Engineering and Management, 148(08).

Xia, P, Xu, F, Zhou, T and Du, J (2022) Benchmarking Human versus Robot Performance in Emergency Structural Inspection. Journal of Construction Engineering and Management, 148(08).

Zarghami, S A (2022) Prioritizing Construction Activities: Addressing the Flaws of Schedule-Based Indexes. Journal of Construction Engineering and Management, 148(08).